Sorry I found no matches, Please try again. 176
vid = 4197pws_id = 350576pws_id = 350576
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.143.17.25 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Wythegill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Wythegill Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Wythegill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, CA15 8RX    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.3 MW
Approx Date of 1st power generation: June 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Airvolution Energy Operational

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Adjacent to the Chemical Works at Siddick Lowca Lane SiddickWorkington CA14 1LG England

 Associated Companies.

Relationship Company (For: Wythegill )
OwnerAirvolution
OperatorAirvolution
DeveloperAirvolution

 DECC Data on this Project: Wythegill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Wythegill Wind Turbine     2.3 MW
Energy Type: Wind Onshore
County: Cumbria     Country: England     LPA: Allerdale Borough Council
Site ID and Reference: 3832 / AA561     District:
Applicant: Airvolution Energy     Application : 2/2011/0259 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 2.3
Site Address: Land at Wythegill Syke, Seaton, Workington, Cumbria
  CA15 8RX
County: Cumbria Region: North West
OS Coordinates: 301881 / 301881
Development Status: Operational
Application Submitted: 4/14/2011 Planning Permission Granted
Application Determined: Permission refused: 12/15/2011
Construction Date: 3/15/2015    
Generator Live 6/15/2015 This Record Last Updated: 6/16/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/15/2011

 OFGEM Data on this Project: Wythegill: Wind :

Site Name: Wythegill
Generator Type: Wind
Scheme : REGO Generator ID: G02736NWEN
Capacity: 1450 Status: Live
Accreditation Date: 4/14/2011    
Commission Date: 5/15/2015    
Applicant: Wythegill Wind Farm Limited
Applicant Address: Wythegill Wind Farm Ltd 1030 Slutchers Lane Centre Park Warrington WA1 1QL England
Address: Adjacent to the Chemical Works at Siddick Lowca Lane Siddick Workington CA14 1LG England
 
Assumptions: Capacity: 1450kW 1.45 MW,
Thus over the month Capacity * 720 hours per month = 1044 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
330 22.76% Issued
323 22.28% Issued
440 30.34% Redeemed
430 29.66% Redeemed
01/01/2017 377 26.00% Redeemed
01/12/2016 - 31/12/2016 00 538 37.10% Issued
01/11/2016 - 30/11/2016 00 358 24.69% Issued
01/10/2016 - 31/10/2016 00 256 17.66% Issued
01/09/2016 - 30/09/2016 00 1 0.07% Pending Tr
Sep-16 00 1 0.07% Issued
01/08/2016 - 31/08/2016 00 361 24.90% Issued
Jul-16 00 336 23.17% Issued
Jul-16 00 336 23.17% Issued
Jun-16 00 195 13.45% Issued
May-16 00 408 28.14% Issued
Apr-16 00 303 20.90% Issued
Mar-16 00 343 23.66% Redeemed
Feb-16 00 483 33.31% Redeemed
Jan-16 00 540 37.24% Redeemed
Dec-15 00 797 54.97% Redeemed
Nov-15 00 634 43.72% Redeemed
Oct-15 00 244 16.83% Redeemed
Sep-15 00 205 14.14% Redeemed
Aug-15 00 343 23.66% Redeemed
Jul-15 3810 382 26.34% Redeemed
Jun-15 3450 345 23.79% Redeemed
May-15 1470 147 10.14% Redeemed
463 31.93% Issued
400 27.59% Issued
473 32.62% Issued
497 34.28% Issued
337 23.24% Issued
604 41.66% Issued
460 31.72% Issued
336 23.17% Issued
381 26.28% Issued
422 29.10% Issued

 Calculations


Capacity: 4.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/16/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.6 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 350576

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School